Internal · trade scope

Quantity takeoff for partitions

CostTakeoff is used across partitions — measure straight off your drawings in m², m, and get a bill of quantities without the learning curve.

CostTakeoff — takeoff canvas1234ABC3.903.653.4511.00 m5.102.25LivingKitchenDiningHallWCStoreUtilityN025 mmetresMEASUREMENTSMetal Stud Partitions70mm stud — 2.40 h12.65 m146mm stud — 2.40 h6.94 mShaft wall — 2.40 h3.20 mHead, Base & DeflectionHead & base track19.59 mDeflection head6.94 mOpenings & SundriesDoor opening 926×2…3 nrCorner bead9.60 mAcoustic sealant39.18 mPattress — sanitary4 nrCostTakeoffTakeoff & EstimatingPROJECTOakfield HouseCLIENTR. & S. BennettDRAWING TITLEMetal Stud Partition LayoutSCALEDRAWNDATE1:100 @A3CostTakeoffJul 2026DWG No.A035REV2Metal Stud PartitionsHead, Base & DeflectionOpenings & Sundries+ Line+ Opening70mm stud — 2.40 h12.65 / 73.37 m+ Line+ Opening146mm stud — 2.40 h6.94 / 40.25 m+ Line+ OpeningShaft wall — 2.40 h3.20 / 18.56 m+ Line+ OpeningHead & base track19.59 / 113.62 m+ Line+ OpeningDeflection head6.94 / 40.25 m+ CountDoor opening 926×20403 / 18 nr+ Line+ OpeningCorner bead9.60 / 55.68 m+ Line+ OpeningAcoustic sealant39.18 / 227.24 m+ CountPattress — sanitary4 / 24 nrOakfield HouseGround Floor — PartitionsBill of Quantities · 9 sub-items · 115 measurementsActive: Metal Stud Partitions

A simple example measured in CostTakeoff — our categories on the left, quantities building on the drawing, your branding on the sheet.

Why CostTakeoff

Fast, honest takeoff for partitions

You measure partitions the way you measure every scope in CostTakeoff — draw areas in m² and runs in metres straight on the PDF and the quantities build into a bill of quantities as you go. The example above is a takeoff just like the ones you'll run.

The method

From drawing to bill of quantities, in four steps

  1. 1

    Upload

    Drop in the PDF drawing set.

  2. 2

    Set the scale

    Once per drawing — the one step worth learning.

  3. 3

    Measure

    Areas, lengths and counts, straight off the sheet.

  4. 4

    Read your BOQ

    Quantities build as you draw. Export to Excel or PDF.

Measure your next partitions job.

Get started