Structure · trade scope

Quantity takeoff for concrete & reinforcement

CostTakeoff is used across concrete & reinforcement — measure straight off your drawings in m³, t, m², and get a bill of quantities without the learning curve.

CostTakeoff — takeoff canvas1234ABC5.204.804.6014.60 m4.103.30N025 mmetresMEASUREMENTSIn-Situ ConcreteGround floor bed66.56 m²Concrete path21.75 m²Retaining wall12.00 mReinforcementFabric reinf. A14266.56 m²Bar reinforcement86.40 mFormwork & JointsEdge formwork25.98 mFormwork to wall12.00 mMovement joint7.02 mDowel bars23 nrCostTakeoffTakeoff & EstimatingPROJECTMeadowbrook — New BuildCLIENTMurphy ConstructionDRAWING TITLEGround Floor Slab & PathsSCALE1:100 @A3DATEJul 2026DWG · REVA001 BIn-Situ ConcreteReinforcementFormwork & Joints+ Area+ SubtractGround floor bed66.56 / 386.05 + Area+ SubtractConcrete path21.75 / 126.15 + Line+ OpeningRetaining wall12.00 / 69.60 m+ Area+ SubtractFabric reinf. A14266.56 / 386.05 + Line+ OpeningBar reinforcement86.40 / 501.12 m+ Line+ OpeningEdge formwork25.98 / 150.68 m+ Line+ OpeningFormwork to wall12.00 / 69.60 m+ Line+ OpeningMovement joint7.02 / 40.72 m+ CountDowel bars23 / 138 nrMeadowbrook — New BuildSite Plan — ConcreteBill of Quantities · 9 sub-items · 115 measurementsActive: In-Situ Concrete

A simple example measured in CostTakeoff — our categories on the left, quantities building on the drawing, your branding on the sheet.

Why CostTakeoff

Fast, honest takeoff for concrete & reinforcement

You measure concrete & reinforcement the way you measure every scope in CostTakeoff — draw areas in m² straight on the PDF and the quantities build into a bill of quantities as you go, with volumes and weights derived from them. The example above is a takeoff just like the ones you'll run.

The method

From drawing to bill of quantities, in four steps

  1. 1

    Upload

    Drop in the PDF drawing set.

  2. 2

    Set the scale

    Once per drawing — the one step worth learning.

  3. 3

    Measure

    Areas, lengths and counts, straight off the sheet.

  4. 4

    Read your BOQ

    Quantities build as you draw. Export to Excel or PDF.